How to Install a Single-Phase DIN Rail Energy Meter and Check CT Direction: OWON PC4711
What does the PC4711 measure and what do I need?
The OWON PC4711 UniClip Pro monitors electricity consumed and produced in a single-phase system by clamping on to the power cables, so no conductor is cut. It has two CT inputs, IA and IB, so it can watch a main circuit and one load, or two loads, at the same time. It also reports bidirectional energy usage and solar production.
- Voltage range 90 to 277 V, 50/60 Hz; single-phase systems only
- CT inner diameters: Ø16 mm 120 A (default), Ø10 mm 80 A, Ø20 mm 200 A and Ø24 mm 300 A (optional)
- 35 mm DIN rail mounting, 19 (W) x 69 (D) x 90 (H) mm
- Wi-Fi 2.4 GHz with BLE pairing; the PC4711-W-E-TY/R also has Ethernet and a dry contact relay
- Energy data reported every 15 seconds
Installation steps
- Turn off the circuit breakers of the distribution box and make sure there is no voltage on their terminals.
- Mount the main unit on the DIN rail.
- Use two power cords to connect the power terminal L/N in parallel to the L/N lines at the output of the circuit breaker.
- Plug the power cord of CT1 into the IA port of the CT terminal: the "+" wire to IA+ and the "-" wire to IA-. Connect CT2 to the IB port in the same way.
- Place CT1 on the live wire of the main circuit breaker and CT2 on the live wire of a load, with the arrow pointing towards the load.
- Insert the power terminal and the CT terminal into the corresponding positions on the main unit.
- After confirming that all connections are correct, turn on the circuit breakers.
These steps summarise the PC4711-W-E-TY/R quick start guide. Follow the full guide and local electrical regulations; installation in a live distribution board should be done by a qualified electrician.
How do I check the CT direction?
Each CT clamp has an arrow. On the PC4711 the arrow points towards the load, away from the supply. A CT fitted the wrong way round reads power with the opposite sign, so a normal load can appear as negative power.
- Clamp the CT around one live wire only, never around the live and neutral together, with the arrow towards the load.
- Close the clamp fully until it latches; a gap lowers the reading.
- Switch on a known load on that circuit and open the app to see the real-time active power.
- If the power shows a negative value for an ordinary load, turn the clamp round and read again.
- Note the direction in your installation record so the next technician sees it.
Why must the supply and the CTs be on the same phase?
The meter takes its voltage from the power terminal and its current from the CTs, and it multiplies them to get power. The quick start guide notes that the power supply wiring of the device and the corresponding CT measurement circuit must be on the same phase. If they are not, the power readings are not valid.
Which wiring layout should I use?
| Layout | CT1 (IA) | CT2 (IB) |
|---|---|---|
| Circuit + load | Live wire of the main circuit breaker | Live wire of one load |
| Two loads | Live wire of load 1 | Live wire of load 2 |
Both layouts are shown in the PC4711 quick start guide. For solar monitoring and grid import and export, see the solar guide below.
What do the LEDs mean after power-on?
| LED | State | Meaning |
|---|---|---|
| Power | On | Power supply connected |
| Net | On | Connected to the Tuya cloud |
| Net | Slow blink | AP mode, waiting for configuration |
| Net | Medium blink | STA mode, failed to connect to the router |
| Net | Fast blink | Connected to the router but not to the Tuya cloud |
| Out | On / Off | Relay on / relay off (PC4711-W-E-TY/R) |
Reset button: press once to switch the relay on or off (can be set in the app), three times quickly to reboot, hold for 5 seconds to reset the network and hold for 10 seconds to factory reset.
How do I add the meter to the app?
Download the Smart Life app, tap Scan and scan the QR code on the meter, or turn on Bluetooth and use Add Device. The Wi-Fi network must be 2.4 GHz. If no device is found, hold the Reset button for 5 seconds until the Net LED blinks slowly and try again. With Ethernet, plug in a cable that can reach the internet.
Which CT size should I choose?
Choose the CT from the expected peak current of the circuit. Current accuracy depends on the CT and the current range; for example the 120 A CT is rated ±1% from 2 to 120 A and ±2% from 0 to 2 A. See the guide on choosing a CT clamp size and the product datasheet.
Related OWON products
OWON PC4711-W-E-TY/R UniClip Pro Wi-Fi and Ethernet Single-Phase Energy Meter with RelayWi-Fi and Ethernet single-phase DIN rail clamp energy meter with dry contact relayWi-FiTuya
OWON PC4711-W-TY UniClip Lite Wi-Fi Single-Phase DIN Rail Energy MeterWi-Fi single-phase DIN rail clamp energy meter with 2 CTsWi-FiTuya
OWON PC472-W-TY/N Wi-Fi Single-Phase DIN Rail Power MeterWi-Fi single-phase DIN rail meterWi-FiTuyaFrequently asked questions
Which way should the CT arrow point on the OWON PC4711?
The arrow points towards the load, as shown in the PC4711 quick start guide.
Can I put the CT around both live and neutral?
No. Clamp the CT around the live wire only. Both wires together cancel each other and the meter reads close to zero.
What happens if I put a CT on the wrong phase?
The power supply wiring and the CT must be on the same phase. If not, the power values are not valid.
Does the PC4711 need a cable to the cloud?
It connects over Wi-Fi 2.4 GHz. The PC4711-W-E-TY/R can also use Ethernet, and the energy data is stored offline and reported again after the network reconnects.
Related guides
- How to Choose the Right CT Clamp Size for a Smart Energy MeterLearn how to choose a CT clamp rating and inner diameter for clamp-on smart energy meters, with the OWON CT options and accuracy bands from...
- Monitoring Solar Production and Grid Usage with Clamp-On Smart Energy MetersHow bidirectional smart energy meters track grid import, export and solar production, and which OWON meters list this function on their...
- How to Choose a Smart Energy Meter: A Buyer's ChecklistA practical checklist for choosing a smart energy meter: supply type, CT rating, accuracy, communication, integration and certifications...
Installation video
Wiring and installation of the OWON PC4711 single-phase DIN rail energy meter: mounting on the rail, connecting the power terminal, fitting the two CTs and checking the readings.
Watch on YouTube: Single Phase DIN Rail Energy Meter Wiring & Installation | OWON PC4711
Steps shown in the video
- Turn off the circuit breakers and confirm there is no voltage on the terminals.
- Mount the meter on the 35 mm DIN rail.
- Connect the power terminal L/N in parallel to the L/N lines at the breaker output.
- Plug CT1 into the IA port and CT2 into the IB port of the CT terminal, "+" to IA+/IB+ and "-" to IA-/IB-.
- Place CT1 on the live wire of the main circuit and CT2 on the live wire of a load, arrow pointing towards the load.
- Insert the power and CT terminals into the meter, then turn the breakers on.
Talk to OWON about your project
Tell us your application, target market and quantity. Our sales team replies with datasheets, protocol documents and pricing.
Send an enquiry WhatsApp +86 13159213403Or email sales@owon.com